Solutions by application / Concrete & formwork
Al Rahimah · UAE project supply
Concrete and formwork fastening solutions
Source project-specific concrete and formwork fastening components in Dubai and the UAE. Choose the product according to the construction stage: temporary formwork and scaffolding, a water barrier at a tie-rod penetration, or a permanent fixing into cured concrete.
Explore products by construction stage
How to choose the right component
Before casting: Check the formwork drawings and tie system. Water stoppers used at tie-rod paths are selected to suit the specified wall detail; they do not replace a complete waterproofing design.
Temporary works: For scaffold connections, confirm pipe compatibility and the specified clamp type with the temporary works designer. Do not substitute a general-purpose fastener for a rated scaffold fitting.
After concrete has cured: For permanent concrete fixings, review the specified base material, load, fixing method and installation requirements. See the anchor bolt range for related foundation and anchoring enquiries.
Where can I buy formwork water stoppers for concrete construction in Dubai?
Contact Al Rahimah with your tie-rod diameter and thread, concrete wall detail, required quantity and delivery destination. The quotation should identify the exact requested product and compatibility requirements. Browse our scaffolding and formwork accessories for related items.
Request a project quotation
Send your item list or drawing, dimensions, material or grade, required standard or coating, quantity and delivery location in the UAE. Confirm suitability with the project engineer before installation.
Contact Al Rahimah →


